PART 16 : Post-Construction Inspection Checklist

Items to Check Immediately After Completion

1Windows & Frames

Windows & Frames

Check Verify windows open and close smoothly, check for dirt or damage, ensure screens are intact, and confirm no silicone sealant has been missed.

2Lighting

Lighting

Check Test all fixtures operate correctly and are installed in the agreed models and positions.

3Painting & Wallpaper

Painting & Wallpaper

Check Look for paint splatters or unpainted spots, check for drips or clumps, and confirm no damage or stains.

4Flooring

Flooring

Check Since floors see the most traffic, inspect for dents or scratches and ensure there are no visible defects.

5Doors

Doors

Check Check handles and hinges for smooth operation and correct spacing.

6Miscellaneous

Miscellaneous

Check Confirm leftover materials and construction debris have been removed, and check finish quality of switches, outlets, etc.

7Tiles

Tiles

Check Walk over tiled areas to detect loose tiles, and inspect for cracks or chips and ensure grout joints are fully filled.

8Finishes

Finishes

Check Check painted and finished surfaces for dirt or damage, and confirm correct colors and materials were used.

9Furniture

Furniture

Check Inspect for scratches or dents from moving pieces, confirm doors and drawers operate smoothly, and ensure no silicone sealant is missing.

10Restrooms

Restrooms

Check Test installation and operation of toilets and sinks, check for cracks or chips, and verify drainage in floors, basins, toilets, and tubs.

Confirm all materials, fixtures, brands, and designs match what was agreed.
By the final cleaning stage, the contractor considers the job done—but this is when you need to inspect thoroughly.
Because once you pay the final balance, further repairs become difficult, identify any issues now.